- 0106:40 - the trailer
- 02The four-point log
- 03The first decision: reuse or regrind
- 04Wash routing
- 05The second inspection
- 06The rebuild
- 07The audit
- 08The part that keeps it honest
8 min read · written on the yard in Dallas, no agency involved.
Intake opens at six forty. By the end of a normal day about four hundred containers will have been looked at, logged and routed, and roughly twenty-four of them will have been condemned. Here is what actually happens in between.
06:40 - the trailer
A trailer backs in and the count starts before anything comes off. Counts disagree more often than you would expect, and settling it at the door rather than at the end of the day prevents an argument three weeks later when somebody invoices.
The four-point log
Each container gets its serial, UN plate, bottle date and previous cargo captured before it moves to a wash queue. Nothing proceeds without all four. If previous cargo cannot be established, the container is flagged non-food permanently at this moment, not later.
The first decision: reuse or regrind
This is the one that matters. The inspector is looking for the three disqualifiers - crazing, cracked welds and any breach - and for the signals that the bottle has absorbed something. Nothing else at this stage. Staining is not a decision point; odour and crazing are.
My job is to find a reason to keep it, not a reason to kill it. Anyone can kill it.
Wash routing
The cargo record sets the cycle: standard, extended dwell with odour treatment, or the isolated food-grade circuit in bay four. Routing by record rather than by appearance is the single biggest difference between a wash line and a reconditioning line.
The second inspection
After washing, every container is looked at again, by a different person. Soil hides cracks. It also hides staining, which means some units grade up here and some grade down. About four percent change grade at this step, and a small number get condemned that passed the first look.
The rebuild
- New gasket set on every unit, no exceptions.
- Valve replaced if the seat shows chemical attack, hardening or does not seal on test.
- Cage pressed straight, welds checked at every corner.
- Leak test at pressure, 100 percent of units.
- Grade tag printed and linked to the serial.
The audit
Every quarter, a hundred graded units are pulled at random and regraded blind by a different inspector. If disagreement exceeds four percent we retrain. The last audit came in at 2.1 percent, which is about as good as a human judgement call gets.
The part that keeps it honest
Nobody on the inspection floor is compensated on throughput or on grade mix, and sales has no input into grading. Marking a B as an A to fill an order is the one thing that will get someone walked out of this building, and everyone knows it. The grade on the tag is the product. Everything else is logistics.
Owen Castellanos
Intake supervisor. First eyes on every container that arrives, and the final word on whether it lives.
More from Owen