- 011. The reused gasket
- 022. The knocked valve in transit
- 033. The wrong elastomer
- 044. Over-torquing the valve
- 055. The vacuum collapse
- 06What to keep on site
6 min read · written on the yard in Dallas, no agency involved.
We get called about spills we did not cause, because customers want to know whether the container failed. Almost never. Here are the five causes, in order of how often they actually happen.
1. The reused gasket
An elastomer gasket takes a compression set. Once it has been squeezed into a thread face for a few months it no longer returns to shape, and reinstalling it produces a joint that seals well enough to pass a glance and weeps under vibration. Gaskets cost a dollar. We replace them on every unit and you should too.
2. The knocked valve in transit
A butterfly handle sticks out exactly where a forklift fork, a pallet corner or a dock plate can catch it. Without a dust cap or outlet cap, a half-opened valve on a loaded trailer becomes 275 gallons on the highway. The cap costs less than two dollars.
3. The wrong elastomer
EPDM in solvent service swells, softens and extrudes out of the seat. The failure is gradual, then sudden. If you cannot say with certainty whether your seats are EPDM or FKM, assume they are EPDM, because that is what comes on almost everything by default.
4. Over-torquing the valve
Somebody finds a weep, reaches for a long wrench and distorts the moulded flange, which makes the weep permanent. The correct procedure is one new gasket, hand tight, plus about a quarter turn with a strap wrench. Not a pipe wrench. Not a cheater bar.
5. The vacuum collapse
Fast discharge with a solid lid pulls a vacuum, the bottle panels inward, and either the container deforms permanently or a seam gives up. Vented lids exist for this exact reason and cost a few dollars. Cracking the fill cap during discharge is the free version.
What to keep on site
- A spill kit actually sized for 275 gallons, not a drum kit.
- Spare gaskets in both EPDM and FKM.
- Outlet caps for every container in motion.
- A strap wrench, and no long-handled pipe wrench anywhere near the valves.
- A written note of which elastomer your cargo needs, posted where people fill.
Four of the five causes above are prevented by parts that cost less than a sandwich. The fifth is prevented by not using a bigger wrench.
Dale Whitmore
Co-founder and operations. Has built three wash lines, two of them twice, and knows caustic chemistry by feel.
More from Dale